Machine OEE, cost analysis, on-time delivery tracking, and capacity planning — turn production data into decisions, not just dashboards.

Data That Drives Decisions

Most AM operations have data scattered across spreadsheets, machine logs, and ERP exports. Pulling a simple answer — "What's our true machine utilization?" or "Are we making money on this part?" — takes hours of manual aggregation.

Because Vectrik captures data at every stage of production, analytics happen automatically. OEE calculates from real machine state data. Cost analysis pulls from actual print times, not estimates. Delivery performance tracks against committed dates, not optimistic guesses.

Machine Performance

Machine OEE

Overall Equipment Effectiveness breaks down into three components: availability, performance, and quality. Vectrik calculates all three from real production data for every machine in your fleet.

  • Availability — uptime vs. downtime, including changeover delays and unplanned stops
  • Performance — actual vs. planned print/cycle times per build
  • Quality — first-pass yield from inline QC and NCR data
  • Per-machine and fleet-wide OEE dashboards
  • Trend tracking over days, weeks, and months
  • Drill-down into specific downtime events and their root causes
EOS M4 #1 — March 2026
Availability
87%
Performance
94%
Quality
98%
Overall OEE 80.1%
Margin Protection

Cost Analysis

Know the true cost of every part you produce. Vectrik tracks material, machine time, labor, and overhead to give you accurate per-part and per-build cost breakdowns.

  • Machine time costs calculated from actual print hours at configured hourly rates
  • Material costs from powder usage per build with lot pricing
  • Labor costs from operator time logged at each stage
  • Overhead allocation across builds and parts
  • Quoted vs. actual cost comparison per work order
  • Margin analysis to identify which jobs are profitable and which aren't
Cost Breakdown: Build 2847
Machine Time 24.5 hrs @ $200/hr $4,900
Material (IN718) 3.2 kg @ $85/kg $272
Post-Processing 6.5 hrs labor $455
Overhead 12% allocation $675
Total Build Cost $6,302
Per Part (12 parts) $525

Delivery Performance & Capacity Planning

Track what matters most: are you shipping on time, and do you have capacity for what's coming?

On-Time Delivery

Track delivery performance across all work orders. See trends over time, identify repeat late causes, and set improvement targets. At-risk alerts flag orders before they become late.

Capacity Utilization

See how full your machines are over the coming weeks. Identify open capacity windows for new orders or spot overcommitment before it causes delays.

Custom Reports

Export production data for any date range, machine, or customer. CSV exports for further analysis in your existing tools. Scheduled report delivery coming soon.

See your data come alive

We'll walk you through OEE dashboards, cost analysis, and delivery tracking with your actual production scenarios.

Request a Demo

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.